We had an impromptu strip down yesterday...............
Customer bike in for some winter fettling. Bodywork was already off, exhaust system had gone off to polishers.
Heads and barrels were already off for the originally planned fettle.
The decision was taken to powder coat the frame at 1 and by 4.00 the frame was on the floor
Loom off, rear subframe stripped bare and removed, headlight assembly off in one piece, footpegs, rear brake, hugger etc. all off then dropped the engine out.
Remove the top yoke, and slide the whole headstock/forks/wheel/brakes assembly out of the frame.
Take out the suspension linkage bolt and the shock/swingarm/wheel is all that's left.
Not a bad afternoons graft that
Might take a little longer to put back together though