Ducati Sporting Club UK
 
 
Thread Tools Search this Thread Display Modes
Prev   Next
  #7  
Old 05-Apr-2004, 14:30
748jim 748jim is offline
Registered Forum User
Montjuic
 
Posts: 56
Join Date: Jan 2004
Mood: Flying!
Job done, it took 45 mins in total. Moved sundry items on the left bar; removed clutch lever, loosened bar and turned 180deg to reveal the offending dowel. After WD-40/pliers/elbow grease, I came to the conclusion that drilling the dowel out was the way forward. I proceeded with a 3.5mm drill bit down the centre of the dowel and then a 4mm to finally open it up. The drill bit gripped the dowel which then came out on the end of the bit.

A similar procedure was done on the right hand bar. A little more difficult as you have to loosen the throttle and starter before getting to the front brake.

Not a big job really but very rewarding as the newly adjusted positions feel so much more natural now. I shall look to adjust the bar position next.

Thanks to all that advised on this point.
Quote+Reply
  
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes
Postbit Selector
Switch to Vertical postbit Use Vertical Postbit

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Recent Posts - Contact Us - DSC Home - Archive - Top
Powered by vBulletin 3.5.4 - Copyright © 2000 - 2025, Jelsoft Enterprises Ltd. - © Ducati Sporting Club UK - All times are GMT +1. The time now is 15:24.